Cable Stayed Bridge, the biggest MOC ever built by Sheepo

This is my third bridge, and it is the biggest MOC I have ever built.

This MOC was presented in TrenBrick event in Madrid, on October 2013. Organized by ALE! (Lego Spanish Association) in the Railroad Museum of Madrid

It has a total length of 524 studs, thats it 419 cm (165 inches)

It is divided in two parts with a 256 studs of span each one.

It has more tham 4000 parts, with 174 11x5x1 Technic panels

It has 206cm of high (82 inches).

The tower can support vertically more than 40Kgs.

Finally a video of the bridge, trains and of the whole event.

Tren de Metro de Madrid

Metro 01¡Hola muchachada!
Os presento una pequeña contribución a TRENbrick. Ya que me propuse construir las paradas de metro ¿cómo no iba a hacer el tren?  ÔÔ

Metro 02Es mi primer MOC trenero, y algo cuadrado sí que es pero, bueno, iremos mejorando. 8?D

Metro 03

Al ser subterráneo tiene que estar iluminado siempre así que le puse unos LED. :)

Metro 04Metro 05Hace tiempo que tengo la intención de grabar el recorrido de los trenes *p, pero no me gusta la idea de poner una cámara sobre un tren, así que me hice con una pequeña cámara y este es el resultado.

Como veis la cámara queda totalmente camuflada en el tren.

Metro 06Metro 07Sinceramente espero que este MOC esté a la altura de las grandes creaciones que vamos a poder contemplar en TRENbrick.

Nos vemos allí  ;)